Public companies › BA.L
BAE Systems BA.L · LSE
Government aviation-parts contract record, attributed to 17 vendor units (CAGE codes) owned by BAE Systems. Data only; not investment advice.
$251.5M
obligated, last 52 weeks
+9%
vs prior 52 ($230.3M)
504
contract actions, 52 weeks
$8.2M
obligated, last 90 days
Outlook, next month
— No lean
Weeks like this one (356 cases) have not been followed by a consistent move either way: +0.1% versus the sector, ahead 49% of the time. Historical tendency of similar weeks, not a forecast and not advice.
Flow Score
week of 2026-09-21 · same for every reader · method and track recordContract flow this week: unusually weak · last month: flat · FAA directives: none
In primes and large-caps, weeks like this (356 cases since 2012) show no measurable effect: +0.1% over the next 20 trading days versus the aerospace ETF, ahead 49% of the time, against +0.1% in ordinary weeks.
A description of the current state of public contracting data and its measured history. Not a recommendation to buy, sell or hold anything.
Our current read
frozen September 23 · scored after 20 trading days (about October 21)
52% chance BAE Systems beats the aerospace sector over the next 20 trading days; expected excess move +0.3%. In words: about as likely as not to beat the sector.
Based on 3,449 comparable weeks since 2012 (same company size, same contract-flow level: normal), pulled toward 50% when the evidence is thin. This number was written down on September 23 and cannot be changed; it is scored against the actual price when the horizon arrives.
Our record on BA.L: no scored calls yet; the first score lands about four weeks after the first read.
A probability, not a recommendation. Every read we have ever made, and how it turned out, is on the research page.
How to read this, in plain terms
The idea. Every week the government signs contracts for aircraft parts, and we know which company won them. When a company suddenly wins far more than its usual week, a natural question is whether its stock tends to move in the weeks after. We measured that for every company on this site, every week since 2012, and this box reports what we found for weeks that look like the current one.
Outlook is the answer in three words. ▲ Leaning higher means that in past weeks like this one, stocks of this size usually went on to beat the aerospace sector over the following month, and did so often enough and by enough that it is unlikely to be chance. ▼ Leaning lower is the reverse. — No lean means the record shows no consistent move either way, which is the honest answer most weeks and for most of the largest companies.
Flow Score is the current week in words: whether this company's contract flow is unusually strong, normal or weak compared with its own past year; whether it is rising or falling over the last month; and whether the FAA has recently issued directives against its products.
What it is not. A tendency in past data, not a forecast, and not a recommendation. Sample sizes are shown so you can weigh it yourself; a lean built on 400 cases means more than one built on 40. Stocks move for many reasons that have nothing to do with parts contracts. Use this as one input, alongside everything else you know.
The weeks behind this outlook (356 comparable weeks; the 40 most recent shown)
Every week since 2012 in which a company of this size had contract flow in the same state as BAE Systems has now. “Next month” is how the stock did against the aerospace sector over the following 20 trading days.
| Week of | Company | Contract flow that week | vs. its normal | Next month |
|---|---|---|---|---|
| 2026-08-17 | HEICO | — | unusually weak | trailed by 1.6% |
| 2026-08-17 | TransDigm | — | far below | beat by 1.5% |
| 2026-08-17 | Honeywell | — | unusually weak | beat by 5.9% |
| 2026-08-17 | Boeing | — | unusually weak | beat by 2.7% |
| 2026-08-17 | Northrop Grumman | — | unusually weak | beat by 2.9% |
| 2026-08-10 | Textron (Bell, Cessna, Beechcraft) | — | unusually weak | beat by 6.8% |
| 2026-08-10 | TransDigm | — | far below | beat by 1.0% |
| 2026-08-10 | Honeywell | — | unusually weak | beat by 6.1% |
| 2026-08-10 | Northrop Grumman | — | unusually weak | beat by 3.3% |
| 2026-08-10 | HEICO | — | unusually weak | trailed by 5.4% |
| 2026-08-10 | Boeing | — | far below | beat by 1.7% |
| 2026-08-03 | L3Harris | — | unusually weak | trailed by 0.9% |
| 2026-08-03 | Northrop Grumman | — | unusually weak | beat by 3.5% |
| 2026-08-03 | HEICO | — | unusually weak | trailed by 3.0% |
| 2026-08-03 | Honeywell | — | unusually weak | trailed by 0.6% |
| 2026-08-03 | Boeing | — | far below | beat by 1.8% |
| 2026-08-03 | TransDigm | — | far below | beat by 4.4% |
| 2026-07-27 | Honeywell | — | unusually weak | trailed by 5.2% |
| 2026-07-27 | Northrop Grumman | — | unusually weak | beat by 5.9% |
| 2026-07-27 | HEICO | — | far below | trailed by 0.5% |
| 2026-07-27 | RTX (Raytheon, Pratt & Whitney, Collins) | — | far below | beat by 2.1% |
| 2026-07-27 | TransDigm | — | far below | beat by 3.4% |
| 2026-07-27 | Boeing | — | far below | trailed by 1.6% |
| 2026-07-27 | Parker-Hannifin | — | far below | beat by 6.9% |
| 2026-07-27 | Lockheed Martin | — | far below | beat by 4.1% |
| 2026-07-20 | TransDigm | — | far below | trailed by 4.6% |
| 2026-07-20 | HEICO | — | far below | trailed by 2.6% |
| 2026-07-20 | Boeing | — | far below | trailed by 0.9% |
| 2026-07-20 | Northrop Grumman | — | unusually weak | beat by 2.7% |
| 2026-07-20 | Honeywell | — | far below | trailed by 8.3% |
| 2026-07-20 | L3Harris | — | unusually weak | trailed by 11.7% |
| 2026-07-20 | RTX (Raytheon, Pratt & Whitney, Collins) | $24K | unusually weak | trailed by 1.2% |
| 2026-07-20 | Parker-Hannifin | — | far below | beat by 9.2% |
| 2026-07-13 | Boeing | — | far below | trailed by 0.0% |
| 2026-07-13 | Parker-Hannifin | — | far below | trailed by 1.1% |
| 2026-07-13 | GE Aerospace (incl. CFM International) | — | unusually weak | trailed by 2.1% |
| 2026-07-13 | Honeywell | — | far below | trailed by 11.1% |
| 2026-07-13 | L3Harris | — | unusually weak | trailed by 9.3% |
| 2026-07-13 | Northrop Grumman | — | far below | beat by 4.5% |
| 2026-07-13 | HEICO | — | far below | beat by 1.9% |
Weekly obligations, this year against last
FPDS aviation-parts actions, all agencies, by signing week.
Units that win
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. 94117$167.2M · 43
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. 80249$29.9M · 139
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION I 49VG4$20.9M · 64
- BAE SYSTEMS LAND & ARMAMENTS L.P. 06085$19.8M · 2
- BAE SYSTEMS LAND & ARMAMENTS L.P. 54786$9.4M · 126
- BAE SYSTEMS CONTROLS INC. 63760$5.3M · 39
- BAE SYSTEMS LAND & ARMAMENTS L.P. 44114$729K · 6
- BAE SYSTEMS (OPERATIONS) LIMITED U9143$280K · 38
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. 0D0D0$204K · 2
- AMZ ALABAMA INC. 076M6$127K · 13
- BAE SYSTEMS CONTROLS INC. 89954$118K · 5
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION I 81413— · 8
- BAE SYSTEMS INFORMATION & ELECTRONIC SYSTEMS INTEGRATION INC 3L667— · 0
- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC. 8M6A5— · 0
- BAE SYSTEMS LAND & ARMAMENTS L.P. 064S4— · 0
What they win, by supply class
- 1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS$144.7M · 399
- 1550 UNMANNED AIRCRAFT$39.0M · 13
- 1510 AIRCRAFT, FIXED WING$32.4M · 8
- 2910 ENGINE FUEL SYSTEM COMPONENTS, NONAIRCRAFT$19.7M · 3
- 2840 GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS$9.7M · 2
- 1670 PARACHUTES; AERIAL PICK UP, DELIVERY, RECOVERY SYSTEMS; AND CARGO TIE DOWN EQUIP$4.5M · 9
- 2995 MISCELLANEOUS ENGINE ACCESSORIES, AIRCRAFT$3.6M · 12
- 1560 AIRFRAME STRUCTURAL COMPONENTS$712K · 29
- 2990 MISCELLANEOUS ENGINE ACCESSORIES, NONAIRCRAFT$53K · 10
- 1730 AIRCRAFT GROUND SERVICING EQUIPMENT$47K · 3
Top NSNs
- 01-631-8465 NSN: 7RH 1680 016318465 P8 PN: 8455463-3$1.3M
- 01-585-5278 NSN: 7RH 1680 015855278 P8 PN: 1072366G-1$927K
- 01-585-5261 NSN: 7RH 7025 015855261 P8 P/N: 1072288P-1$802K
- 01-644-7135 NSN: 7RH 1680 016447135 P8 PN: 8465504-2$503K
- 01-670-7156 NSN: 7RH 1680 016707156 P8 PN: 1072376P-1$499K
- 01-645-7816 NSN: 7RH 1680 016457816 P8 PN: 8427534-5$437K
- 01-633-6181 NSN: 7RH 1680 016336181 P8 PN: 8473476-1$263K
- 01-675-3175 NSN: 7RH 1680 016753175 P8 P/N: 1072371P1$139K
- 01-665-1945 NSN: 7R 1680 016651945 P8 PART NUMBER: 8519772-1 NSN: 7R 1680 016803628 P8 PART$86K
- 01-561-2490 NSN: 1680015612490 P/N: 1025290G-2NOM: A4 POWER SUPPLY S/N: 20091REQ: PJAME45338$71K
- 01-655-0921 FMS CASE, FR-P-P-RAP REQUISITIONS, 1NSN, 1680016550921 PART NUMBER, 1025377G-4NO$19K
- 01-561-2485 NSN: 7R 1680 015612485 ITEM NAME: SUM TRANSMITTER,AIRP/N: 1025282G-1QTY: 1 UNITA$16K
Latest contract actions
Each row is one FPDS action. Click the stock number for its page, the part number for sellers, the unit for its vendor record, or the PIID for the award on FPDS. $0 is a modification that moved no money.
| Signed | Agency | Item | NSN | Unit | Obligated | Record |
|---|---|---|---|---|---|---|
| 2026-09-17 | U.S. COAST GUARD | P00001 EFFECTIVE DATE 09/17/2026 EXERCISE OPTION QUANTITY TO PURCHASE OF STRUT, A/C DIAG. R/H TO BE USED ON THE MH60T HE | — | 54786 | $25K | FPDS → |
| 2026-09-11 | U.S. COAST GUARD | PURCHASE OF STRUT, A/C DIAG. R/H TO BE USED ON THE MH60T HELIOPTERS. | — | 54786 | $25K | FPDS → |
| 2026-08-19 | U.S. COAST GUARD | PROCUREMENT OF 30 EA OF BASEMEMBER FOR USE ON THE MH-65 AIRCRAFT | — | 54786 | $65K | FPDS → |
| 2026-07-14 | FEDERAL ACQUISITION SERVICE | P8A MISSION CONTROL AND DISPLAY SYSTEM MCDS EO 14398 COMPLIANT | — | 80249 | $8.1M | FPDS → |
| 2026-06-29 | DEPT OF DEFENSE | TO PROVIDE FRD QUARTERLY REPORTS FOR THE E-2D FOR THE ITEMS LISTED WITHIN THIS DELIVERY ORDER. | — | 80249 | $0 | FPDS → |
| 2026-06-29 | DEPT OF DEFENSE | F-16 SUPPORT EQUIPMENT | — | 49VG4 | — | FPDS → |
| 2026-06-26 | DEPT OF DEFENSE | 8512153526 HARNESS SET,AIRCRAF | — | 54786 | $0 | FPDS → |
| 2026-06-25 | DEPT OF DEFENSE | 8512153526 HARNESS SET,AIRCRAF | — | 54786 | $136K | FPDS → |
| 2026-06-25 | DEPT OF DEFENSE | 8511644709 GAUZE | — | U9143 | $0 | FPDS → |
| 2026-06-24 | DEPT OF DEFENSE | NOMENCLATURE: MODULE ASSEMBLY ENGINE NSN: 7R1680015854772 PART NUMBER: 115E1119G1 QUANTITY: 1 RTAT: 90 RMC: 3Z | — | 63760 | $4K | FPDS → |
| 2026-06-24 | DEPT OF DEFENSE | F-16 SUPPORT EQUIPMENT SPARES FOR SLOVAKIA | — | 49VG4 | $0 | FPDS → |
| 2026-06-24 | DEPT OF DEFENSE | CHASSIS UNIT | — | 80249 | $0 | FPDS → |
| 2026-06-24 | DEPT OF DEFENSE | 8511420575 | — | 54786 | — | FPDS → |
| 2026-06-24 | DEPT OF DEFENSE | 8511372901 | — | 54786 | — | FPDS → |
| 2026-06-23 | DEPT OF DEFENSE | 8512159767 PIPE,EXHAUST | — | 076M6 | $3K | FPDS → |
| 2026-06-23 | DEPT OF DEFENSE | 8511172498 PANEL,CONTROL,ELECT | — | 63760 | $0 | FPDS → |
| 2026-06-22 | DEPT OF DEFENSE | AFLCMC/WI | — | 94117 | $8.5M | FPDS → |
| 2026-06-18 | DEPT OF DEFENSE | 8512164255 WING PANEL,ARMORED | — | 54786 | $28K | FPDS → |
| 2026-06-18 | DEPT OF DEFENSE | 8512126081 CCA-1153B PMT,AIRCR | — | 89954 | $0 | FPDS → |
| 2026-06-17 | DEPT OF DEFENSE | 8512189417 CUSHION,SEAT,AIRCRA | — | 54786 | $386K | FPDS → |
Plus 187 DLA contracts in the last 30 days, $11.8M in contract value (DIBBS award history, counted per contract).
FAA Airworthiness Directives naming their products, 12 months
None in the last 12 months, or this company does not hold a type certificate.
In the news
- BAE Systems unveils Shadow EW payloads for small aircraft, production from 2027 AeroTime · 2026-09-18
Attribution is by vendor name against a curated map of listed parents and known subsidiaries; joint ventures and recent acquisitions can be missed. Obligations are FPDS aviation-parts actions above the micro-purchase threshold, by signing date. This page is a record of public contracting data. It is not investment advice and PartsAndPlanes makes no recommendation about any security.
Get the daily Market Pulse
New DLA RFQs, SAM.gov notices, yesterday's awards and FAA directives, weekday mornings. Free, one click to leave.